Transformer Practice; Manufacture, Assembling, Connections, Operation and Testing

by

This historic book may have numerous typos and missing text. Purchasers can download a free scanned copy of the original book (without typos) from the publisher. Not indexed. Not illustrated. 1913 Excerpt: ... laminations may be hammered. During the building up of the laminations they should be pressed down two or three times, depending on Fig. 121.--Assembly of coils for a shell-type transformer. the size of transformer being built. For this clamping, the top iron frame is usually lowered and forced down with especially ...

Currently there are no copies available. However, our inventory changes frequently. Please check back soon or try Book Fetch.